As the mine continues to sequence through a lower grade area of the Valley of the Kings, all stopes above cut-off grade of approximately 5.0 grams per tonne gold are being mined as they become available for production.  Accordingly, gold grade is expected to average approximately 10.4 grams per tonne over the course of 2019; both grade and tonnes are expected to be higher in the second half of the year."